This is the last beginner webinar series from ecoinvent which focuses more on the different system models available in ecoinvent. There are three system models offered: Allocation, cut-off by classification, Allocation, at the point of substitution (APOS), and Substitution, consequential, long term. The difference between each system model is further explained in the video below.
Introduction to ecoinvent system models
Updated over 2 months ago
